SNOWBLOWER CONVERSION...
Posted: Mon Aug 21, 2017 4:39 pm
Hey Group,
I'm starting the conversion from manual to electric chute positioning. I have all the pieces together to start but ran into a question I'm sure someone can answer. I'm going to weld a socket onto the gear which is attached to the window motor. I should be ok connecting my welder ground to the gear on the motor when I am welding around the socket, right? I'm assuming I have a complete and safe ground?
Thanks a bunch ahead of time.
Bri
I'm starting the conversion from manual to electric chute positioning. I have all the pieces together to start but ran into a question I'm sure someone can answer. I'm going to weld a socket onto the gear which is attached to the window motor. I should be ok connecting my welder ground to the gear on the motor when I am welding around the socket, right? I'm assuming I have a complete and safe ground?
Thanks a bunch ahead of time.
Bri